The slab is where the schedule gets real.
The slab for this home was placed with a pump truck after the forms and beams were set. Everything that runs below the floor has to be in place before concrete, because it cannot be moved afterward.
On a similar project, plumbing locations, sleeves for future utilities, and the floor height relative to finished grade deserve one more review before the pour. A change after that point means cutting concrete or living with the compromise.